Optimal opportunistic tamping scheduling for railway track geometry

Hamid Khajehei, Mohammad Haddadzade, Alireza Ahmadi, Iman Soleimanmeigouni, Arne Nissen

Structure and Infrastructure Engineering · 2020 · 24 citations · 32 references

DOIFull text

Open access

Concepts

Abstract

This study has been dedicated to the optimization of opportunistic tamping scheduling. The aim ofthis study has been to schedule tamping activities in such a way that the total maintenance costs andthe number of unplanned tamping activities are minimized. To achieve this, the track geometry tampingscheduling problem was defined and formulated as a mixed integer linear programming (MILP)model and a genetic algorithm was used to solve the problem. Both the standard deviation of thelongitudinal level and the extreme values of isolated defects were used to characterize the trackgeometry quality and to plan maintenance activities. The performance of the proposed model wastested on data collected from the Main Western Line in Sweden. The results show that different scenariosfor controlling and managing isolated defects will result in optimal scheduling plan. It is alsofound that to achieve more realistic results, the speed of the tamping machine and the unused life ofthe track sections should be considered in the model. Moreover, the results show that prediction ofgeometry condition without considering the destructive effect of tamping will lead to an underestimationof the maintenance needs by 2%.

References

32