Infrastructures · 2020 · 44 citations · 11 references
ArchitectureConstruction ManagementDesignBuilding MaterialsConstruction EngineeringConstruction Technology3D PrintingBuilding ConstructionConstruction Materials EvaluationConstruction MethodsMilitary Technology3D Printed Concrete3D Printed Models3D Printing In ConstructionArmored VehiclesControlled Environment TestingPrintabilityProject Cost MonitoringThree-dimensional Printing
In November 2019, U.S. Marines, Air Force, and Army Corps of Engineers personnel demonstrated the viability and simplicity of three-dimensionally (3D)-printed construction in a controlled environment at the U.S. Army Engineer Research and Development Center—Construction Engineering Research Laboratory in Champaign, Illinois. The tri-service exercise spanned three days and culminated in the construction of three 1 m × 1 m × 1 m (3 ft × 3 ft × 3 ft) concrete dragon’s teeth (square pyramid military fortifications used to defend against tanks and armored vehicles) and several custom-designed objects. The structural components were printed using a custom-built, gantry-style printer called ACES Lite 2 and a commercially available, proprietary mortar mix. This paper examines the viability of using 3D-printed construction in remote, isolated, and expeditionary environments by considering the benefits and challenges associated with the printing materials, structural design, process efficiency, labor demands, logistical considerations, environmental impact, and project cost. Based on the results of this exercise, 3D-printed construction was found to be faster, safer, less labor-intensive, and more structurally efficient than conventional construction methods: the dragon’s teeth were printed in an average of 57 min each and required only two laborers. However, the use of commercially procured, pre-mixed materials introduced additional cost, logistical burden, and adverse environmental impact as compared to traditional, on-site concrete mixing and production. Finally, this paper suggests future applications and areas of further research for 3D-printed construction.
11
Time gap effect on bond strength of 3D-printed concrete
Yi Wei Daniel Tay, Guan Heng Andrew Ting, Ye Qian et al. · Virtual and Physical Prototyping · 2018 · 312 citations · Full text