IFAC-PapersOnLine · 2019 · 15 citations · 7 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction SystemsSchedulingInteger ProgrammingJob SequencingJob Shop SchedulingMakespan MinimizationResource-constrained SchedulingSchedule OptimizationFlexible Job Shop SchedulingInteger Linear ProgrammingMixed-integer Linear ProgrammingMixed-integer ProgrammingMixed-integer Programming For SchedulingMulti-resource SchedulingScheduling ConstraintsScheduling Problems
This work presents a novel formulation for quality control laboratory scheduling considering both equipment and analysts as constraints. The problem is modelled as a dual-resource constrained flexible job shop problem. The formulation considers analyst tasks at different times during the processing of samples. The problem is formulated as a mixed integer linear programming model (MILP) aiming to minimise makespan. Two sets of instances for the scheduling problem are proposed. The first instance consists of a small example that illustrates the proposed formulation and is solved to optimality. The second instance mimics the real industrial problem and shows the challenges resulting from growing complexity.
7
Alex J. Ruiz‐Torres, José Humberto Ablanedo‐Rosas, Luis Daniel Otero · International Journal of Production Research · 2011 · 23 citations