Quality and Reliability Engineering International · 2019 · 27 citations · 18 references
ManagementManufacturing EngineeringQuality ManagementProcess ControlProcess Systems EngineeringQuality ControlControl ChartsQuality Control In ManufacturingStatistical Process ControlControl ChartingIndustrial Process MonitoringProcess Control ChartsQuality Control ChartingQuality Control ChartsVariable Sampling
Abstract In many industrial manufacturing processes, the ratio between two normal random variables plays a key role in ensuring quality of products. Thus, monitoring this ratio is an important task that is well worth considering. In this paper, we combine a variable sampling interval (VSI) strategy with a cumulative sum (CUSUM) scheme to create a new type of control chart for purpose of tracking the ratio between two normal variables. The average time to signal ( A T S ) and the expected average time to signal ( E A T S ) criteria are used to evaluate the performance of the new VSI CUSUM RZ control chart. The numerical results show that the proposed control chart has much more attractive performance in comparison with the standard CUSUM‐RZ control chart and the VSI EWMA‐RZ control chart.
18
An approach to the probability distribution of cusum run length
D. Brook, D. A. Evans · Biometrika · 1972 · 882 citations
On the ratio of two correlated normal random variables
D. V. Hinkley · Biometrika · 1969 · 624 citations