IEEE Transactions on Parallel and Distributed Systems · 2019 · 62 citations · 52 references
ComputingComputer EngineeringComputer ScienceHeterogeneous ComputingParallel ComputingSchedulingHeterogeneous System ArchitectureParallel Computing SystemsPower-aware DesignResource SchedulingResource-constrained SchedulingTask SchedulingEnergy-aware SchedulingEnergy-aware Task SchedulingEnergy-efficient Parallel ComputingHeterogeneous SchedulingHeterogeneous Task SchedulingPower-aware SchedulingScheduling In Multiprocessor Systems
Power-aware task scheduling on processors has been a research hotspot in computing systems. Given an application G containing a set N of tasks {n <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">1</sub> ,...,n <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">|N|</sub> }, and a system containing a set U of processors {u <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">1</sub> ,..., u <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">|U|</sub> }, the power-aware task scheduling generally refers to finding the appropriate processor and frequency for each task n <sub xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">i</sub> , so as to make sure that all the tasks can be finished efficiently and the overall energy consumption is guaranteed. In this article, we study the problem of minimizing the schedule length for energy consumption constrained parallel applications on heterogeneous computing systems, where the schedule length refers to the time interval between starting the first task and finishing the last task. For this problem, existing work adopts a policy that preassigns the minimum energy consumption for each unassigned task. Nevertheless, our analysis reveals that, such a pre-assignment policy could be unfair for the low priority tasks, and it may not achieve an optimistic schedule length. Thereby, we propose a new task scheduling algorithm that suggests a weight-based mechanism to preassign energy consumption for unassigned tasks, and we provide the rigorous proof to show its feasibility. Further, we show that this idea can be extended to solve reliability maximization problems with energy consumption constraint or with both deadline and energy consumption constraints, where the reliability refers to the probability of executing application G without failures, and the deadline constraint refers to the “allowable” maximum schedule length. We have conducted extensive experiments based on real parallel applications. The experimental results consistently demonstrate that our proposed algorithms can achieve favourable performance, compared to state-of-the-art algorithms.
52
A scheduling model for reduced CPU energy
Fei Yao, Alan Demers, Scott Shenker · 2002 · 1.5K citations
Scheduling for Reduced CPU Energy
1994 · 1.1K citations
An Energy-Efficient Task Scheduling Algorithm in DVFS-enabled Cloud Environment
Zhuo Tang, Ling Qi, Zhenzhen Cheng et al. · Journal of Grid Computing · 2015 · 281 citations