Journal of Quality Technology · 2017 · 64 citations · 22 references
EngineeringIndustrial EngineeringProcess ControlProcess Systems EngineeringQuality ControlControl ChartsControl SystemsControl TheoryControl ChartingProcess Control ChartsReference Sample AnalysisSelf-starting Control ChartsShewhart Control ChartsTolerance Intervals
When in-control parameters are unknown, they have to be estimated using a reference sample. Due to the use of different reference samples in phase I, the control chart performance in phase II will vary across practitioners. This variation is especially large for small sample sizes. To prevent low in-control average run lengths, new corrections for Shewhart control charts are proposed that guarantee a minimum in-control performance with a specified probability. However, a minimum in-control performance guarantee generally lowers the out-of-control performance. To balance the tradeoff between in-control and out-of-control performance, the minimum performance threshold and specified probability can be adjusted as desired. The corrections are given in a closed form so that the bootstrap method, which has recently been suggested, is no longer required. The performance of our proposed correction is illustrated by simulating some practical situations. Furthermore, a comparison is made with tolerance intervals and self-starting control charts.
22
The Distribution of Chi-Square
Edwin B. Wilson, Margaret M. Hilferty · Proceedings of the National Academy of Sciences · 1931 · 827 citations · Full text
The Annals of Mathematical Statistics
Journal of the American Statistical Association · 1938 · 242 citations · Full text