Scheduling of unit-length jobs with bipartite incompatibility graphs on four uniform machines

Hanna Furmańczyk, Marek Kubale

Bulletin of the Polish Academy of Sciences Technical Sciences · 2017 · 13 citations · 10 references

DOIFull text

Open access

Concepts

Abstract

Abstract In the paper we consider the problem of scheduling n identical jobs on 4 uniform machines with speeds s 1 ≥ s 2 ≥ s 3 ≥ s 4 , respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are subject to some kind of mutual exclusion constraints modeled by a bipartite incompatibility graph of degree Δ, where two incompatible jobs cannot be processed on the same machine. We show that the general problem is NP-hard even if s 1 = s 2 = s 3 . If, however, Δ ≤ 4 and s 1 ≥ 12s 2 , s 2 = s 3 = s 4 , then the problem can be solved to optimality in time O(n 1.5 ). The same algorithm returns a solution of value at most 2 times optimal provided that s 1 ≥ 2s 2 . Finally, we study the case s 1 ≥ s 2 ≥ s 3 = s 4 and give a 32/15-approximation algorithm running also in O(n 1.5 ) time.

References

10