IOP Conference Series Materials Science and Engineering · 2019 · 29 citations · 8 references
EngineeringEarth SciencesPetroleum EngineeringHydrogeologyPetroleum GeologyReservoir EngineeringGas InjectionGas Injection ProcessesPetroleum System AnalysisReservoir GeologyShale Oil ReservoirsUnconventional Reservoir EngineeringContinuous Gas InjectionFlue Gas InjectionNatural Gas InjectionPore VolumeResidual Oil RecoveryWater InjectionWaterflood PerformanceWaterflood Performance Evaluation
Abstract The article substantiates the conditions for effective water and gas impact on productive formations of the Upper Jurassic and Achimov deposits of the Vyintoy oil field: for the UJ formation, alternate injection of “wet” gas and water (gas injection for 3 months – water injection for 3 months) with a maximum intake capacity of gas injection wells of 15 thousand m 3 per day with a total volume of gas agent injection of 20 % of the pore formation volume; for the Ach formation, continuous injection of “wet” gas with a maximum intake capacity of gas injection wells of 30 thousand m 3 per day.
8