Myrrha accelerator driven system programme: recent progress and perspectives

Ait Abderrahim Prof., Marc Dierckx, L. Popescu, Marc Schyns, Alexey Stankovskiy, den Eynde Prof., D. Vandeplassche

Izvestiya Wysshikh Uchebnykh Zawedeniy Yadernaya Energetika · 2019 · 17 citations · 2 references

DOIFull text

Open access

Concepts

Abstract

A collaboration of SCKCEN, IAP and BEVATECH GmbH is currently constructing the room temperature CH section of the 16.6 MeV CW proton injector for the MYRRHA project.The elaboration of all the construction readiness files for the construction of the accelerating cavities of the first CH section (1.5 to 5.9 MeV) is ongoing.In parallel, the planning, development and fabrication of all further components of this accelerator section is in progress, while the full study for the remaining section is under preparation.This contribution is documenting the most recent status.