ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingInteger ProgrammingProduction SchedulingResource-constrained SchedulingSchedule OptimizationScheduling TheoryTask SchedulingCrane OperationCranesInteger Linear ProgrammingMixed-integer Linear ProgrammingMixed-integer ProgrammingMixed-integer Programming For SchedulingScheduling Problems
This paper studies a double-load crane scheduling problem (DLCSP) in steel slab yards. A slab yard stores slabs in stacks. To prepare for use in production, some slabs need to be moved from one place to another. These movement tasks are performed by a double-load crane which can hold up to two slabs simultaneously. Given a set of tasks and possibly precedence relationships among them, the scheduling problem is to allocate the tasks to double-load operations and determine the schedule for the crane to perform the tasks so as to minimise the makespan. The problem is first formulated as a mixed integer linear programming (MILP) model with variables representing the order of tasks. Based on properties of the problem, it is then reformulated from a crane operation perspective. Computational experiments are carried out on practical data collected from a steel company. The results show that both models can solve practical sized problems optimally, with the second model being more efficient.
23
Operations research at container terminals: a literature update
Robert Stahlbock, Stefan Voß · OR Spectrum · 2007 · 1.1K citations
A heuristic rule for relocating blocks
Kap Hwan Kim, Gyu-Pyo Hong · Computers & Operations Research · 2004 · 335 citations · Full text
Management, Industrial Engineering, Operations Management +13