Applied Sciences · 2019 · 45 citations · 35 references
EngineeringCivil EngineeringConstruction EngineeringGeotechnical EngineeringTunnel EngineeringTunnel DesignTunnel Excavation MethodsTunnel Lining DesignTunnel MonitoringTunnelingUnderground Excavation MethodsDeformationDeformation ControlExcavation Deformation MonitoringField MonitoringStress DistributionStress Distribution Around TunnelsStress Redistribution Around TunnelsTunnel Support
Large‑deformation tunnel excavation in soft rock poses serious safety hazards and economic losses, making knowledge of stress‑field distribution and deformation law essential for rational design and safe construction. The study aims to investigate the surrounding rock stress and displacement state at the Dongsong hydropower station in Sichuan Province, China. This investigation was conducted through theoretical analysis, numerical simulation, and field monitoring. The results show that short‑bench construction with an optimum bench length of 10–14 m and timely second lining at 16 m effectively controls deformation and plastic‑zone extent, that increased support strength and time reduce peripheral displacement and plastic radius, and that reserved deformation and position‑specific adjustments are needed to avoid secondary expansion.
The problem of large deformation is very prominent in deep-buried tunnel excavation in soft rock, which brings serious potential safety hazards and economic losses to projects. Knowledge of the stress field distribution and deformation law is the key to ensuring rational design and safe construction in large deformation tunnels of soft rock. As described in this paper, theoretical analysis, numerical simulation and field monitoring were employed to investigate the surrounding rock stress and displacement state in the Dongsong hydropower station in Sichuan Province, China. The results show that the short-bench construction method can effectively control the deformation of surrounding rock and range of the plastic zone. In order to reserve enough working space, the optimum bench length in the actual construction was 10 to 14 m. The peripheral displacement and plastic radius decreased with the increase of tunnel support strength and the advance of supporting time. The displacement can be effectively controlled by applying the second lining in time at a position about twice the diameter of the hole (16 m) from the working face. A reasonable reserved deformation should be adopted to avoid secondary expanding excavation. The values of different positions in the tunnel laterally and longitudinally may be different, and adjustments are needed according to the actual situation.
35