Mortality and Health Outcomes in North Carolina Communities Located in Close Proximity to Hog Concentrated Animal Feeding Operations

Julia Kravchenko, Sung Han Rhew, Igor Akushevich, Pankaj Agarwal, H. Kim Lyerly

North Carolina Medical Journal · 2018 · 51 citations · 0 references

DOIFull text

Open access

Concepts

Abstract

### Objective Early Fontan Failure (EFF) is a serious complication following total cavopulmonary connection (TCPC), characterised by high central venous pressure (CVP), low cardiac output and resistance to medical therapy. This study aimed to estimate post-operative CVP in TCPC patients (CVP~TCPC~) using data routinely collected during pre-operative assessment. We sought to determine if this metric correlated with measured post-operative CVP and if it was associated with EFF. ### Methods In this retrospective study, CVP~TCPC~ was estimated in 131 patients undergoing pre-TCPC assessment by cardiac magnetic resonance imaging and CVP measurement under general anaesthesia. Post-operative CVP during the first 24hours in ICU was collected from electronic patient records in a subset of patients. EFF was defined as death, transplantation, TCPC takedown or emergency fenestration within the first 30days. ### Results Estimated CVP~TCPC~ correlated significantly with CVP~ICU~ (r=0.26, p=0.03), particularly in patients without a fenestration (r=0.45, p=0.01). CVP~TCPC~ was significantly associated with EFF (Odds Ratio \[OR\] 1.12 (1.02-1.24), p=0.02). A threshold of CVP~TCPC~ ≥33mmHg was found to have the highest specificity (90%) and sensitivity (67%) for identifying EFF (area under receiver operating curve, AUC = 0.79), OR 18.8 (3.1-114), p=0.001. This association was stronger in patients with single SVCs. ### Conclusions Estimated CVP~TCPC~ is an easily calculated metric combining pre-operative pressure and flow data. Higher CVP~TCPC~ is associated with an increased risk of EFF and is correlated with directly measured post-TCPC pressure. Identification of patients at risk of EFF has the potential to guide risk mitigation strategies.