International Journal of Production Research · 2018 · 101 citations · 34 references
ManagementComputer ScienceIndustrial EngineeringOptimizationProduction PlanningSchedulingDynamic SchedulingJob SchedulingJob SequencingJob Shop SchedulingMachine SchedulingScheduling TheoryArtificial Bee ColonyFlexible Job Shop SchedulingHeuristic AlgorithmsHeuristic ApproachMachine Set-up OptimizationMetaheuristic SchedulingScheduling Problems
In real scheduling problems, unexpected changes may occur frequently such as changes in task features. These changes cause deviation from primary scheduling. In this article, a heuristic model, inspired from Artificial Bee Colony algorithm, is proposed for a dynamic flexible job-shop scheduling (DFJSP) problem. This problem consists of n jobs that should be processed by m machines and the processing time of jobs deviates from estimated times. The objective is near-optimal scheduling after any change in tasks in order to minimise the maximal completion time (Makespan). In the proposed model, first, scheduling is done according to the estimated processing times and then re-scheduling is performed after determining the exact ones considering machine set-up. In order to evaluate the performance of the proposed model, some numerical experiments are designed in small, medium and large sizes in different levels of changes in processing times and statistical results illustrate the efficiency of the proposed algorithm.
34
The Complexity of Flowshop and Jobshop Scheduling
M. R. Garey, David Johnson, Ravi Sethi · Mathematics of Operations Research · 1976 · 2.6K citations