Applied Sciences · 2018 · 14 citations · 22 references
Decision Area DivisionDistributed Energy SystemEngineeringSmart GridEnergy ManagementEnergy EfficiencyEnergy OptimizationDesignComputer EngineeringPower System OptimizationSystems EngineeringEnergy StorageMulti-energy SystemVirtual Power PlantDistributed Energy GenerationVpp Construction ModelMultiple-criteria Decision Analysis
Virtual power plant (VPP) is an effective technology form to aggregate the distributed energy resources (DERs), which include distributed generation (DG), energy storage (ES) and demand response (DR). The establishment of a unified and coordinated control of VPP is an important means to achieve the interconnection of energy internet. Therefore, this paper focuses on the research of VPP construction model. Firstly, a preliminary introduction on all kinds of the DERs is carried out. According to the relevant guidelines, the decision area of the VPP is carefully divided, and the decision variables representing the various resources in the area are determined. Then, in order to get a VPP with low daily average cost, good load characteristics, high degree of DG consumption and high degree of resource aggregation, a multi-objective VPP construction model based on decision area division is established, and various constraints including geographic information are considered. The improved bat algorithm based on priority selection is used to solve this model. Finally, the correctness and effectiveness of the model are verified by an example.
22
Liwei Ju, Zhongfu Tan, Jinyun Yuan et al. · Applied Energy · 2016 · 322 citations
Virtual power plant mid-term dispatch optimization
Hrvoje Pandžić, Igor Kuzle, Tomislav Capuder · Applied Energy · 2012 · 235 citations