Engineering Optimization · 2018 · 49 citations · 25 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingJob SchedulingJob SequencingMachine SchedulingProduction SchedulingScheduling TheoryHeuristic AlgorithmsHeuristic SchedulingScheduling HeuristicsSequence SchedulingSingle Machine Makespan MinimizationSingle-machine Scheduling
This article considers the single-machine group scheduling problem with deterioration effect and ready times. The objective of this problem is to determine the sequence of groups and the sequence of jobs to minimize the makespan. To solve the problem, an algorithm based on enumeration, an heuristic algorithm and a branch-and-bound algorithm are developed and exhaustively tested. The computational results show that the performance of the heuristic algorithm is fairly accurate in obtaining near-optimal solutions and the branch-and-bound algorithm is very effective in obtaining optimal solutions.
25
Parallel-machine scheduling of deteriorating jobs with potential machine disruptions
Yunqiang Yin, Yan Wang, T.C.E. Cheng et al. · Omega · 2016 · 75 citations