Engineering Optimization · 2018 · 20 citations · 37 references
ManagementComputer ScienceIndustrial EngineeringAlgorithmsOptimizationSchedulingCombinatorial OptimizationFlow Shop SchedulingJob SchedulingJob SequencingMachine SchedulingScheduling TheoryAgent SchedulingFlow ShopMulti-agent SchedulingNo-wait Flow Shop SchedulingPareto Frontier AnalysisPareto Optimal SchedulingPareto-based OptimizationPolynomial-time Algorithms
This article studies a multi-agent scheduling problem on a set of m machines in a no-wait flow shop system, where each agent's objective function is to maximize its own weighted number of just-in-time jobs. Two variants of the problem are investigated. One is the constrained optimization problem and the other is the Pareto optimization problem. When the number of agents is arbitrary, both problems are proved to be strongly -hard. When the number of agents is fixed, pseudo-polynomial time algorithms are first designed to solve them, respectively, then an -approximation algorithm is provided for the former problem, and an -approximate Pareto-optimal frontier is constructed for the latter problem.
37
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations
Scheduling Problems with Two Competing Agents
Alessandro Agnetis, Pitu B. Mirchandani, Dario Pacciarelli et al. · Operations Research · 2004 · 462 citations · Full text