International Journal of Geosciences · 2018 · 12 citations · 8 references
EngineeringCivil EngineeringMining EngineeringGeotechnical EngineeringMine DesignSlope StabilityBench DesignGeotechnical DesignOpen-pit Mine DesignWaste Dump DesignBench HeightDump Bench DesignDump DesignDump Geometry DesignMine Waste Dump Bench DesignNumerical ModelingSafety Berm DesignShear Stress
In next two years, the current waste dump of Narynsukhait coal mine is predicted insufficient to accommodate the overburden as limited of the waste dump capacity. Thus, redesigning waste dump is paramount to increase capacity of the dump in future. This paper describes current condition of waste dump of Narynsukhait coal mine and then discusses the optimization of waste dump geometry by analyzing the effect of different waste dump’s bench configuration on slope performance. Optimization of the geometry is carried out by investigating and comparing the performance of geometrical combinations of bench height, bench angles and number of safety berm by means of numerical modeling. The model shows that increasing height of bench is able to induce shear stress in the bench and may initiate bench instable. However, the shear stress can be limited by having safety berm and/or reducing bench angle to satisfy the stability criteria.
8
The use of the Slip Circle in the Stability Analysis of Slopes
A. W. Bishop · Géotechnique · 1955 · 2.7K citations
Engineering, Civil Engineering, Geotechnical Engineering +11
Mine Overburden Dump Failure: A Case Study
Brett Poulsen, Manoj Khanal, A. Manohar Rao et al. · Geotechnical and Geological Engineering · 2013 · 112 citations