Sizing renewable generation and storage systems in households under varying price mechanisms can advance home energy management systems. The study aims to determine optimal PV and BESS sizing in a smart household using a bi‑level HEMS model under different pricing schemes, PV subsidies, and output/load uncertainty. A bi‑level HEMS model is solved with a hybrid cataclysmic genetic algorithm and DICOPT solver in GAMS, evaluating six pricing scenarios and subsidy sensitivity. With subsidies, only PV is needed under SPT, whereas both PV and BESS are required under RTP and TOU; PV installation is justified only when subsidies reach a threshold.

Abstract

The study on the sizing of renewable energy generation systems and energy storage systems together in a household considering different price mechanisms can further promote the development of the home energy management system (HEMS). In this paper, a HEMS expressed as a bi-level model is provided to investigated capacity allocation strategy of the photovoltaic (PV) and battery energy storage system (BESS) in a smart household considering: 1) the impact of electricity price mechanisms which include the time-of-use pricing (TOU), the real-time pricing (RTP), and the stepwise power tariff (SPT); 2) the effect of subsidies of PV; and 3) the uncertainty in the PV output and seasonal load profiles. Then, the hybrid approach which combines the cataclysmic genetic algorithm and the DICOPT solver in GAMS is employed to find an optimal solution. Finally, six cases with different price mechanisms and approaches, as well as the sensitivity analysis of optimal solution to subsidies are presented. Results indicate that, with the subsidies, only the PV system needs to be equipped in a household under the SPT, while the PV system and BESS need to be equipped together under the RTP and TOU. Only when the subsidies of PV reach a certain level will the installation of PV be considered.

References

28