Differential settlement remediation for new shield metro tunnel in soft soils using corrective grouting method: case study

Shunhua Zhou, Junhua Xiao, Honggui Di, Yaohong Zhu

Canadian Geotechnical Journal · 2018 · 88 citations · 7 references

Concepts

TL;DR

In the Yangtze River Delta, many metro tunnels built in soft soils suffer excessive differential settlement that threatens serviceability, posing a challenge due to the rheologic sensitivity of the soils. This study presents a case analysis of treating differential settlement in the new shield tunnel of Ningbo Metro Line 2. The authors propose a corrective grouting and lifting strategy—bottom grouting, inner support, real‑time monitoring, and immediate adjustment—to realign the deviated tunnel axis. The treatment achieved an average uplift of 30 mm, a maximum of 41 mm meeting the target, and limited convergence deformation to 10 mm, below the 15.5 mm threshold, demonstrating the method’s effectiveness and providing a reference for similar projects.

Abstract

In the Yangtze River Delta of China, a large number of metro tunnels have been constructed in soft soils. The excessive and differential tunnel settlement may impair the serviceability of the metro system. The treatment of such excessive and differential settlement in rheologic and sensitive soft soils is a challenge because the tunnel may incur a larger settlement due to construction disturbances. In this paper, a case study of the differential settlement treatment of the new shield tunnel of Ningbo Metro line 2 is presented. A maximum tunnel settlement of 214 mm was observed several months after construction of the tunnel was completed. To uplift the deviated tunnel axis, a grouting and lifting measure named “bottom grouting, inner support, real-time monitoring and immediate adjusting” is proposed. The settlement treatment section is successfully uplifted with an average value of 30 mm, and the maximum final uplift amount of the tunnel is 41 mm, which reached the target value of uplift. The maximum convergence deformation caused by the grouting is 10 mm, which is less than the maximum acceptable deviation, i.e., 15.5 mm. The corrective grouting method and the valuable monitoring data presented in this study can provide a reference for projects with similar problems in the future.

References

7