Journal of Optical Communications and Networking · 2018 · 16 citations · 16 references
ComputingComputer SystemsInformation TechnologyCritical Infrastructure ProtectionData ManagementDistributed SystemsBackup SystemsData BackupData RedundancyDisaster RecoveryHigh AvailabilityNetwork BackupBackupBackup RoutingBackup StrategiesData Center NetworkGeographically Distributed BackupInteger Linear ProgrammingLinear Integer OptimizationWarning Time
A geographically distributed data center network threatened by large‑scale disasters requires heterogeneous data backup for critical nodes within early warning time, with each data type having its own safe node candidates. The study proposes two backup schemes—maximum data backup and fair data backup—by exploiting early warning time at critical nodes. Each scheme is formulated as an integer linear program and a heuristic that selects safe backup nodes and routes to resolve resource competition. Numerical experiments confirm the ILP correctness and demonstrate the heuristics’ efficiency.
By assuming a geographically distributed data center network (DCN) threatened by large-scale disaster, heterogeneous data backup is investigated for the threatened node (defined as the critical node) within a given early warning time, where different types of data may have their own candidate sets of safe nodes for data backup. By properly exploring the early warning time at the critical node, two backup schemes, maximum data backup and fair data backup, are proposed. The former maximizes the total amount of data that can be backed up. The latter takes fairness among different data types into account to maximize the same backup proportion (in terms of percentage of the total amount) for each data type. For each scheme, an integer linear program (ILP) and a heuristic are proposed by properly selecting a set of safe backup DCN nodes and corresponding backup routes to solve the resource competition issue. Extensive numerical results confirm the correctness of the ILP formulations and the efficiency of the heuristics.
16