International Journal of Production Research · 2017 · 40 citations · 60 references
ArchitectureConstruction ManagementIndustrial EngineeringOptimizationProduction EngineeringSchedulingCombinatorial OptimizationCrossover OperatorsEvolutionary ComputationEvolutionary OptimizationGenetic AlgorithmsPopulation-based SearchCycle TimeCycle Time MinimizationGenetic Algorithm OptimizationMulti-objective Assembly Line BalancingMutationProduction System OptimizationTwo-sided Assembly Line BalancingTwo-sided Assembly Lines
This article deals with a real-life multi-objective two-sided assembly line rebalancing problem (MTALRBP) with modifications of production demand, line’s structure and production process in a Chinese construction machinery manufacturing firm. The objectives are minimising the cycle time and rebalancing cost, considering some specific constraints associated with the inevitable wait time, such as novel cycle time, idle time and balanced constraints. A modified non-dominated sorting genetic algorithm II (MNSGA-II) is proposed to solve this problem. MNSGA-II employs some problem-specific designs for encoding and decoding, initial population, crossover operator, mutation operator and selection operator. The great performance of MNSGA-II is demonstrated from two aspects: one is through the comparison between the representative results and current situation in the production system in terms of some ALs’ performance evaluation index, the other is utilising the comparison between the proposed MNSGA-II and two versions of initial NSGA-II in terms of ratio, convergence and spread.
60
Ehsan Ahmadi, M. Zandieh, Mojtaba Farrokh et al. · Computers & Operations Research · 2016 · 224 citations
Management, Industrial Engineering, Operations Management +17