AMBIO · 2017 · 16 citations · 14 references
EngineeringEnvironmental EngineeringEnvironmental SciencesWastewater TreatmentWater Quality ManagementWater TreatmentNutrient RemovalPhosphorus RemovalSludge TreatmentWastewater BiotreatmentWastewater ManagementWater PollutionActivated Sludge Phosphorus RemovalBiological Nutrient RemovalBiological Phosphorus RemovalChemical Phosphorus PrecipitationChemical PrecipitationEnhanced Biological Phosphorus RemovalPhosphorus Removal Process OptimizationWastewater Treatment Plants
Rural wastewater treatment plants (WWTP) are recognized as a significant phosphorous (P)-emission source in the German sub-catchments of the Baltic Sea. But enhancement of P-removal is cost intensive especially for small communities. This study proposes a concept to efficiently reduce P-emissions from WWTP by introducing low-cost non-constructional measures and assessing the resulting change of ambient water quality on a river basin scale. As case study, we choose the Warnow catchment in Mecklenburg-Vorpommern (Germany) where 76 % of WWTP-emissions originate from treatment plants without P-discharge limits. For these facilities, we evaluated two modification options: (1) optimization of enhanced biological Phosphorous removal (EBPR) in activated sludge systems (ASS) and/or (2) chemical precipitation (where EBPR is applicable). The total operational optimization potential in the Warnow catchment is about 20 %. Further improvements can only be applied by a chemical precipitation, with the drawback of increasing the wastewater disposal cost up to 6.5 euros CAP−1a−1. To prioritize relevant plants for improved P-removal we proposed two evaluation criteria: combining absolute emission, and impact on ambient water quality and costs.
14
Willi Gujer, Mogens Henze, Takahashi Mino et al. · Water Science & Technology · 1999 · 1.8K citations
Engineering, Chemical Engineering, Environmental Engineering +14