Engineering Optimization · 2017 · 28 citations · 28 references
ManagementIndustrial EngineeringManufacturing EngineeringOptimizationProduction PlanningSchedulingJob SchedulingMachine SchedulingMulti-objective SchedulingProduction SchedulingSchedule OptimizationScheduling OptimizationBi-objective SchedulingComputational OptimizationHarmony SearchLocal SearchRemanufacturingRemanufacturing OperationsReschedulingScheduling Problems
In this article, scheduling and rescheduling problems with increasing processing time and new job insertion are studied for reprocessing problems in the remanufacturing process. To handle the unpredictability of reprocessing time, an experience-based strategy is used. Rescheduling strategies are applied for considering the effect of increasing reprocessing time and the new subassembly insertion. To optimize the scheduling and rescheduling objective, a discrete harmony search (DHS) algorithm is proposed. To speed up the convergence rate, a local search method is designed. The DHS is applied to two real-life cases for minimizing the maximum completion time and the mean of earliness and tardiness (E/T). These two objectives are also considered together as a bi-objective problem. Computational optimization results and comparisons show that the proposed DHS is able to solve the scheduling and rescheduling problems effectively and productively. Using the proposed approach, satisfactory optimization results can be achieved for scheduling and rescheduling on a real-life shop floor.
28
A New Heuristic Optimization Algorithm: Harmony Search
Zong Woo Geem, Joong Hoon Kim, G. V. Loganathan · SIMULATION · 2001 · 6.2K citations
Mahamed G. H. Omran, Mehrdad Mahdavi · Applied Mathematics and Computation · 2007 · 754 citations