IEEE Transactions on Systems Man and Cybernetics Systems · 2017 · 68 citations · 53 references
ManagementIndustrial EngineeringSupply Chain ManagementOptimizationProduction PlanningSchedulingBatch SchedulingCombinatorial OptimizationFlow Shop SchedulingGenetic AlgorithmsProduction SchedulingSupply Chain OptimizationFlow ShopHeuristic AlgorithmsHeuristicsLocal SearchLocal Search AlgorithmsMetaheuristic SchedulingNeighborhood SearchVariable Neighborhood Search
Rapid changes in production environments have motivated researchers and industrial manufacturers to coordinate the production and distribution in supply chain management. This paper aims to address the permutation flow shop scheduling problem with batch delivery to multiple customers. In this problem, products are first manufactured in a permutation flow shop, and subsequently delivered to multiple customers in batches. To optimize the tradeoff between customer service and distribution cost, the objective of this paper is to minimize the total cost of tardiness and batch delivery. To deal with such optimization problem, two simple heuristics and a novel meta-heuristic (GA-TVNS) are developed to determine integrated production and distribution schedules. GA-TVNS hybridizes genetic algorithm and variable neighborhood search (VNS) to provide better exploration and exploitation in the search space. Moreover, to improve the local search of VNS, two new learning-based neighborhood structures are designed based on the classical school learning process of teaching-learning-based optimization. Computation experiments on both small-sized and large-sized test problems indicate that GA-TVNS performs the best among all the compared scheduling algorithms.
53
Nenad Mladenović, Pierre Hansen · Computers & Operations Research · 1997 · 4.1K citations
The Complexity of Flowshop and Jobshop Scheduling
M. R. Garey, David Johnson, Ravi Sethi · Mathematics of Operations Research · 1976 · 2.6K citations