A heuristic approach for the stochastic optimization of mine production schedules

Luis V. Montiel, Roussos Dimitrakopoulos

Journal of Heuristics · 2017 · 66 citations · 14 references

DOIFull text

Open access

Concepts

TL;DR

Mining engineers traditionally plan open‑pit schedules based on fixed plant conditions, while mineral‑processing engineers optimize for a regular feed, and although simultaneous optimizers exist, they often ignore geological uncertainty, causing production and cash‑flow shortfalls. This paper presents a heuristic method to generate life‑of‑mine production schedules that consider operating alternatives for processing plants and incorporate geological uncertainty. The method uses iterative improvement by swapping periods and destinations of the mining blocks to generate the final solution. At a copper deposit, the method increased expected net present value by 30% over a standard industry practice while controlling mine and processing capacities.

Abstract

Traditionally, mining engineers plan an open pit mine considering pre-established conditions of operation of the plant(s) derived from a previous plant optimization. By contrast, mineral processing engineers optimize the processing plants by considering a regular feed from the mine, with respect to quantity and quality of the materials. The methods implemented to optimize mine and metallurgical plans simultaneously are known in the mining industry as global or simultaneous optimizers. The development of these methods has been of major concern for the mining industry over the last decade. Some algorithms are available in commercial mining software packages however, these algorithms ignore the inherent geological uncertainty associated with the deposit being considered, which leads to shortfalls in production, quality, and expected cashflows. This paper presents a heuristic method to generate life-of-mine production schedules that consider operating alternatives for processing plants and incorporate geological uncertainty. The method uses iterative improvement by swapping periods and destinations of the mining blocks to generate the final solution. The implementation of the method at a copper deposit shows its ability to control mine and processing capacities while increasing the expected net present value by 30% when compared with a solution generated using a standard industry practice.

References

14