Water Research · 2017 · 85 citations · 39 references
EngineeringEnvironmental EngineeringEnvironmental SciencesBioreactor DesignWastewater TreatmentWater TreatmentNitrogen RemovalNutrient PollutionNutrient RemovalNutrient RetentionPhosphorus RemovalWater PollutionBiological Nutrient RemovalBiological Phosphorus RemovalDenitrificationDenitrifying Phosphorus RemovalFilter MediaHydraulic Retention TimeRemovalWastewater Treatment Nutrient Removal
; N removal efficiencies: 18-95% across all HRTs). The range of HRTs tested here resulted in various undesirable pollution swapping by-products from the denitrifying bioreactors: nitrite production when nitrate removal was not complete and sulfate reduction, chemical oxygen demand production and decreased pH during overly long retention times. The downstream P-filter placement provided a polishing step for removal of chemical oxygen demand and nitrite.
39