Procedia Engineering · 2017 · 33 citations · 10 references
ArchitectureConstruction ManagementProject ManagementBuilding Information ModelingConstruction Project ManagementMulti-criteria Decision MakingBim For Sustainability AnalysisBuilding AssessmentBuilding Life-cycle AssessmentMulti-criteria Decision AnalysisRedevelopment PlanningCase Study EvaluationLifetime ManagementRedevelopment PotentialSustainable Development Integration
The paper deals with abandoned former industrial buildings problem and buildings’ redevelopment possibilities with emphasis on sustainable development. A complex decision-making model for redevelopment of abandoned buildings, combining Building Information Modelling (BIM) and Multiple Criteria Decision Making (MCDM) techniques, is proposed. A case study of a former measurement equipment factory is presented. Ranking of possible redevelopment alternatives of the building using Weighted Aggregated Sum Product Assessment method with grey attributes scores (WASPAS-G) is proposed and the most rational projects are selected. While BIM techniques supports an effective selection process and allows implementation of full lifetime management strategy of a project and then of a real object.
10
Maurice Murphy, Eugene McGovern, Sara Pavía · ISPRS Journal of Photogrammetry and Remote Sensing · 2013 · 470 citations
Architecture, Architectural Engineering, Building Science +11
Edmundas Kazimieras Zavadskas, Zenonas Turskis, Jurgita Antuchevičienė · Studies in Informatics and Control · 2015 · 116 citations · Full text