Booster of Electrons and Positrons (BEP) Upgrade to 1 GeV

D. B. Shwartz, Dmitry Berkaev, Daria Bochek, Ivan Koop, I.L. Korenev, Alexandre Krasnov, I. K. Sedlyarov, Petr Shatunov, Yuri Shatunov, Ilya Zemlyansky

JACOW · 2014 · 11 citations · 0 references

DOIFull text

Open access

Concepts

Abstract

At present new electron and positron injection complex in BINP is comissioned and ready to feed VEPP-2000 collider with intensive beams with energy of 450 MeV. To obtain peak luminosity limited only by beam-beam effects in whole energy range of 160-1000 MeV and to perform high average luminosity with small dead time the top-up injection is needed. Booster BEP upgrade to 1 GeV includes modification of all magnetic elements, including warm dipoles magnetic field increase up to 2.6 T, vacuum chamber, RF-system, injection-extraction system. BEP comissioning is scheduled to the end of 2014.