EngineeringMining EngineeringResource EconomicsMine EconomicsMine PlanningUnderground MiningMine DevelopmentMine Infrastructure DesignMine Planning EconomicsMining GeologyUnderground Excavation MethodsUnderground Mine DesignChromite DepositsHaulageMine Haulage PlanningNet Present ValueNet Present Value ComparisonOre Haulage PlanningOrebody Access DesignOrebody Access Planning
This paper deals with the selection of alternative accesses to a podiform chromite orebody in Turkey. The most important alternatives studied in a related project have been stated as a new vertical shaft and a ramp system. The comparison of these alternatives have been carried out on the basis of total investment costs, ore transport unit cost and net present value (NPV) of overall project for various depth. The results show that up to the depth of 700 m, the total investment cost and NPV favours the ramp access while unit ore transport cost make the shaft access preferable.