Lirias (KU Leuven) · 2014 · 33 citations · 22 references
AgricultureDecision SciencesRenewable Energy IntegrationRenewable Energy SystemsSchedulingEnergy System ModelingRenewable EnergyRenewable Energy TransitionDispatch ModelingEnergy PlanningLong-term Energy PlanningMixed-integer ProgrammingOperational Energy CostsRenewable Integration ModelingSustainable Energy PlanningSustainable Energy Transitions
Long-term (LT) energy system planning models are frequently used in studies analyzing the transition towards a sustainable energy system. To limit the computational cost, these LT models typically have a low temporal resolution. In addition, these models typically operate at a technology level, rather then considering individual power plants. Therefore, operational constraints and cycling costs of power plants cannot be represented, i.e. the operational detail is low. For energy systems with a high penetration of intermittent renewables (VRES), these simplifications could have a substantial impact on the model outcome. This work analyzes and quantifies the impact of both the low temporal resolution and the limited operational detail for an increasing share of intermittent renewables in the generation mix. To this end, the results of a LT planning model using a low temporal resolution are compared to a LT model using hour-by-hour data. Furthermore, to assess the impact of the limited operational detail, the dispatch of the LT models is re-evaluated using a mixed integer linear unit commitment (UC) model. Using a low temporal resolution is shown to lead to an inaccurate representation of the residual load duration curve (RLDC), in turn leading to sub-optimal investments, an over-estimation of the potential uptake of VRES and an underestimation of operational costs. Neglecting operational detail of power plants leads to similar results, though to a lesser degree. These effects are quantified for a case study based on the Belgian power system. In this study, operational costs in the LT model with at a low temporal resolution are shown to be 3-58% lower than in the corresponding UC model, whereas for the model with a high temporal resolution the underestimation of operational costs is only 3-23%. Highest deviations are observed for the largest shares of VRES.
22
Energy Technology Systems Analysis Programme
Antti Lehtilä, Richard Loulou · 2005 · 182 citations
Engineering, Electrical Engineering, Systems Engineering +12