IFAC-PapersOnLine · 2016 · 14 citations · 15 references
ManagementIndustrial EngineeringOperations ManagementAlgorithmsOptimizationSchedulingCombinatorial OptimizationFlow Shop SchedulingJob SchedulingJob SequencingMachine SchedulingMetaheuristic OptimizationFlow ShopHeuristic AlgorithmsMetaheuristic SchedulingPermutation SchedulesPermutation SchedulingScheduling With Sequence-dependent Setup TimesSequence-dependent Setup TimesSetup Times
This paper addresses the problem of scheduling a set of independent jobs with setup times on a set of machines in a permutation flow shop environment. A metaheuristic known as the Migrating Birds Optimization (MBO for short) is designed for the minimization of the overall completion time. A computational study is conducted to analyze the efficiency of this approach on instances that can be found in Sistemas de Optimizacion Aplicada (http://soa.iti.es/problem-instances).
15
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations
A survey of scheduling problems with setup times or costs
Ali Allahverdi, C.T. Ng, T.C.E. Cheng et al. · European Journal of Operational Research · 2006 · 1.3K citations · Full text
Management, Industrial Engineering, Operations Management +12
Variable neighborhood search for the p-median
Pierre Hansen, Nenad Mladenović · Location Science · 1997 · 393 citations