Concepedia

Abstract

This paper discusses a multi-item capacitated lot-sizing and scheduling problem in a flow-shop system with energy consideration. A mixed integer linear programming is formulated. The planning horizon is defined by a set of periods where each one is characterized by a length, an electricity price, a maximal allowed power and an external demand. Since the capacitated lot-sizing problems are NP-hard, a fix-and-relax heuristic is developed. To evaluate the effectiveness of the proposed heuristic, computational experiments are presented and numerical results are discussed and analyzed. The obtained results are promising.

References

YearCitations

Page 1