Water Science & Technology · 2000 · 118 citations · 3 references
EngineeringChemical EngineeringEnvironmental EngineeringWaste ManagementWastewater TreatmentWater TreatmentBiological Treatment ProcessesNitrogen RemovalNutrient RemovalSludge TreatmentWaste TreatmentWastewater BiotreatmentAerationAmmonia RemovalAnaerobic TreatmentMunicipal Waste TreatmentNitrificationSewage Sludge TreatmentSewage Treatment SystemsWastewater Treatment Nutrient Removal
The second generation of our originally proposed sewage treatment system, which consists of a UASB reactor as an anaerobic pre-treatment unit and curtain-type DHS (downflow hanging sponge) reactor as an aerobic post-treatment unit, was installed at a municipal sewage treatment site. A 550-day continuous experiment demonstrated that the whole combined system successfully achieved 94–97% of unfiltered-BOD removal, 81–84% of unfiltered-COD removal, and 63–79% of SS removal, at an overall HRT of 8 h (6 h for UASB and 2 h for DHS units). The combined system performed an excellent organic removal as well as a fairly efficient nitrification, i.e. 52–61% of ammonia-nitrogen removal. Our proposed combined system possesses prominent advantages: requiring neither external aeration input nor excess sludge withdrawal.
3