International Journal of Production Research · 2016 · 15 citations · 19 references
ManagementIndustrial EngineeringOperations ManagementOptimizationProduction PlanningSchedulingBranch And BoundCombinatorial OptimizationFlow Shop SchedulingInteger ProgrammingJob SchedulingMachine SchedulingFlow ShopInteger Linear ProgrammingMixed-integer Linear ProgrammingMixed-integer ProgrammingMixed-integer Programming For SchedulingScheduling ProblemsTwo-machine Flow Shop SchedulingTwo-machine Scheduling
This paper addresses the problem of scheduling, on a two-machine flow shop, a set of unit-time operations subject to the constraints that some conflicting jobs cannot be scheduled simultaneously on different machines. In the context of our study, these conflicts are modelled by general graphs. The problem of minimising the maximum completion time (makespan) is known to be NP-hard in the strong sense. We propose a mixed-integer linear programming (MILP) model. Then, we develop a branch and bound algorithm based on new lower and upper bound procedures. We further provide a computer simulation to measure the performance of the proposed approaches. The computational results show that the branch and bound algorithm outperforms the MILP model and can solve instances of size up to 20,000 jobs.
19
P. Erdős, A. Rényi · Publicationes Mathematicae Debrecen · 2022 · 5.2K citations
The Complexity of Flowshop and Jobshop Scheduling
M. R. Garey, David Johnson, Ravi Sethi · Mathematics of Operations Research · 1976 · 2.6K citations