PubMed · 1986 · 41 citations · 0 references
EngineeringEnvironmental EngineeringEnvironmental SciencesEnvironmental RemediationWastewater TreatmentWater TreatmentNematode BiologyNematode ExtractionNematode ManagementPond ManagementDomestic Water ManagementHelminth Egg RecoveryPond Wastewater TreatmentWaste Stabilization LagoonsWaste Stabilization PondsWastewater Stabilization Ponds
The removal of intestinal nematode eggs in waste stabilization ponds treating domestic waste-water was studied in northeast Brazil. Anaerobic and primary facultative ponds achieved Ascaris spp. removals of 88-98% and 99-100%, and hookworm removals of 91-97% and 98-100%, respectively. Egg-free effluents were produced by a single primary facultative pond with a retention time of 18.9 days, and by an anaerobic and a secondary facultative pond in series with retention times of 6.8 and 5.5 days. It is concluded that effluents with less than or equal to 1 egg per litre can be produced by a 1 day anaerobic pond followed by a 5 day secondary facultative and a 5 day maturation pond.