Engineering Optimization · 2016 · 54 citations · 26 references
EngineeringMathematicsMining EngineeringMine DesignMine PlanningOptimizationCombinatorial OptimizationMine SchedulingMine SequencingPit OptimizationBlock SequencingExtraction Sequence OptimizationMathematical Programming For Mine SequencingOpen Pit Mine SequencingOpen-pit MiningOpen-pit SchedulingPrecedence RulesShort-term Mine Sequencing
This study presents a comprehensive mathematical formulation model for a short-term open-pit mine block sequencing problem, which considers nearly all relevant technical aspects in open-pit mining. The proposed model aims to obtain the optimum extraction sequences of the original-size (smallest) blocks over short time intervals and in the presence of real-life constraints, including precedence relationship, machine capacity, grade requirements, processing demands and stockpile management. A hybrid branch-and-bound and simulated annealing algorithm is developed to solve the problem. Computational experiments show that the proposed methodology is a promising way to provide quantitative recommendations for mine planning and scheduling engineers.
26
Optimization by Simulated Annealing
Scott Kirkpatrick, C. D. Gelatt, M.P. Vecchi · Science · 1983 · 44.6K citations
SME mining engineering handbook
Choice Reviews Online · 2011 · 815 citations