The timeliness of end-slope in surface coal mines was studied based on the relationship between end-slope of surface coal mines,inner dump and working slope.The influences of mining parameters on end-slope exposure were analyzed with the exposing time of end-slope as the criterion for valuing the timeliness of end-slope.The end-slope angle can be increased to 42° in Antaibao surface coal mine according to comparative analysis to changes in coefficient of stability before and after the burying slope of end-slope as well as the given estimating standard.The results show that the speeds of mining area and dump are the key factors which will greatly effect the exposure time.The usage of the method of inner-dumping with burying slope can fully increase the end-slope angle.