Journal of Glaciolgy and Geocryology · 2002 · 38 citations · 0 references
Natural SciencesEarth SciencesGeological EngineeringEngineering GeologyGeotechnical EngineeringSoil ScienceFrozen Ground ProcessesGround FreezingPeriglacial GeologyPeriglacial ProcessesPermafrostPermafrost GeologyFrozen Soil ProcessesIce LayersPermafrost CharacterizationPermafrost Degradation ImpactsPermafrost Engineering GeologyPermafrost GeomorphologyPermafrost SoilsRailway Construction
The Qinghai-Tibetan Railway is the highest and longest railway on plateau in the world. The railway will cross 550 km of permafrost. Under global warming and permafrost degradation, many engineering difficulties will occur to the construction of the railway. In order to efficiently solve the problems caused by permafrost, it is necessary to deeply prospect and evaluate the engineering geological characteristics of permafrost, over which the railway will cross. In this paper the permafrost in the Beiluhe Test Field of the Qinghai-Tibetan Railway is analyzed from geological aspect. In fieldwork, as the present classification system of frozen soil has application difficulty, a practicable classification is put forward based on visible ice content in soils. Through practice and comparing with classical system, it is proved the practicable classification is reliable. Surveying shows that the soil is dominated by granule soil, and ground water is rich in the field. There are both high temperature permafrost and low temperature permafrost with rich ground ice layers, and the permafrost table is 2~3 m in depth. Such geological conditions are susceptive to engineering construction. From the above characteristics, the Test Field is classified into bad and very bad engineering geological sections. In these sections, special engineering treatment depending on geological conditions must be applied to the railway construction, otherwise potential failure might appear.