Water Science & Technology · 1985 · 13 citations · 0 references
EngineeringBiological EngineeringEnvironmental EngineeringNutrient ManagementWastewater TreatmentWater TreatmentAnaerobic DigestionAnaerobic MetabolismBiological Treatment ProcessesNutrient RemovalPhosphorus RemovalWastewater BiotreatmentAnaerobic TreatmentBiological Nutrient RemovalBiological Phosphorus RemovalNutrient Removal TechnologiesPhosphate Ion ReleasePhosphorus Removal In Biological Nutrient Removal SystemsSludge SettleabilityWastewater Treatment Nutrient Removal
Laboratory-scale studies on the performance of three-stage Phoredox nutrient removal systems under nominal anaerobic retention times varying from 6 to 24 h are described. Particular attention is given to the effect of these extended periods of anaerobiosis on biological phosphate release and uptake, nitrification and denitrification. Increasing the retention time in the abovementioned range had no deleterious effect on nitrification, COD removal, sludge settleability and denitrification but resulted in significantly improved phosphate removals. Up to 15 mg/ℓ phosphate (as P) could be removed from settled wastewater at nominal anaerobic retention times of 12 h or more.