2011 · 12 citations · 4 references
ArchitectureConstruction ManagementProject ManagementConstruction Project ManagementConstruction SchedulingProject Scheduling4D Construction SchedulingConstruction PlanningSchedule Development4D ModelingConstruction Process ImprovementConstruction Progress MeasurementConstruction Progress TrackingFour-dimensional Construction VisualizationProgress VisualizationReal-time MonitoringSchedule Visualization
Today's demand of construction industry requires a highly accurate planning, scheduling and management of the process of the project which can enable the overall optimization of the cost, time and resources. The older system of usage of MS Project and Primavera for scheduling, AutoCAD drawings and taking a lot of strain and explaining the status of the project to the client is very difficult and time consuming, owing to the fact that the client and the store manager might not be fluent with the technical terms used in the schedules and graphical representations. Instead of using the older, traditional methods of CAD drawings and schedule sheets, one can integrate them on a platform to create a 4D view of the project using GIS environment. The aim of the study is intended to demonstrate the understanding of the methodology to create the GIS based 4D model for optimization and real time monitoring of the project. ArcScene module of ArcGIS is utilized, along with Primavera P3 for this study. Integrated GIS based 4D model has been developed and utilized for the visualization of the construction progress of the project. A case study of factory building of CIGFIL Polymers, located at Hosakote, Bengaluru has been selected for the present study. Different stages of the construction process and activities are generated in different layers using ArcGIS software. Primavera P3 software has been used for creation of the schedules and these are linked with the GIS layers. It is found from the study of actual building information at site and the building simulation model that some overlapping and rework can be avoided.
4