Temburong Bridge, Brunei

Matthew Carter, Sammy Yip, Naeem Hussain, Kok Kong Chin, Lee Sing Ding, Siew Long Lim

Report · 2015 · 12 citations · 0 references

Concepts

Abstract

<p>Temburong district has been physically isolated from the rest of Brunei which has hindered the economic growth of the district. A sea-crossing is planned to link the district to Brunei-Muara. A feasibility study was carried out between 2010 and 2012 to establish the alignment and preliminary design of the link, assess the project impacts and analyse the costs and benefits.</p>