Group production scheduling for minimum total tardiness Part(I)

Nobuto Nakamura, Teruhiko Yoshida, Katsundo HITOMI

A I I E Transactions · 1978 · 30 citations · 1 references

Concepts

Abstract

Abstract This paper considers the problem of group scheduling on a single stage to minimize total tardiness. It is assumed that jobs are classified into several groups on the basis of group technology. Optimal decision as to scheduling sequences will be made as to product group and specific job. This paper proves basic theorems that establish the relative order in which pairs of groups are processed in an optimal schedule. In general, scheduling problems of moderate size may be at least partially ordered so that very few schedules remain to be searched. Two practical algorithms for determining the optimal group schedule and the near optimal group schedule are proposed. Numerical examples are presented in detail.

References

1