Incorporating Bank-Toe Erosion by Hydraulic Shear into the ARS Bank-Stability Model: Missouri River, Eastern Montana

Andrew Simon, Andrew Collison, Anthony L. Layzell

2003 · 25 citations · 11 references

Concepts

Abstract

Bank-stability concerns along the Missouri River, eastern Montana are heightened by a proposed change in flow releases from Ft Peck dam to improve habitat conditions for Pallid Sturgeon. The effects of the proposed flow releases on streambank pore-pressures and bank-toe erosion needs to be evaluated to properly model bank-stability. The ARS Bank-Stability Model incorporates pore-water pressure distributions, layering, confining pressures, reinforcement effects of riparian vegetation and complex bank geometries to solve for the factor of safety (Fs). To increase the applicability and accuracy of the model for use in predicting critical conditions the hydraulic effects of bank-toe erosion have been added. Upper-bank stability is often a function of the degree of fluvial undercutting that occurs during rises in stage when the bank toe becomes submerged and steepened. This erosion, which is a function of the erodibility of previously failed materials and in situ sediments at the toe has been difficult to measure or estimate in the field. Recent field research on erosion of in situ cohesive streambeds and bank toes with a submerged jet-test device provides a means of calculating bank-toe erosion. Results of almost 200 tests at stream sites across the United States provide the following general relation: k = 0.1 τc–0.5; where k = erodibility coefficient in cm3/N-s and τc = critical shear stress in Pa. Critical shear stresses are obtained in situ with the jet-test device (92 tests) for bank-toe materials along the Missouri River, Montana to obtain k and to calculate an erosion rate based on an excess shear-stress relation: ε = k (τ – τc); where ε = erosion rate in m/s and τ = average boundary shear stress in Pa. Inputs for the bank-toe erosion routine are: (1) a rectangular-shaped hydrograph of specified height and duration, (2) bed or water-surface slope, (3) flow depth, (4) bank geometry, and (5) τc for all bank layers and failed debris. Erosion is simulated normal to the submerged bank surface and the resulting bank geometry serves as input into the bank-stability part of the model.

References

11