AIAA SPACE 2013 Conference and Exposition · 2013 · 20 citations · 2 references
EngineeringAerospace EngineeringSystems EngineeringSpacecraft DesignSystems ArchitectureSystems DesignComputational ModelingDesign Space ExplorationMission RequirementsModel-based DesignSpacecraft ConfigurationSystems Engineering For SpacecraftArchitecture ExplorationCellular System DesignModel-based Design ExplorationModular Spacecraft DesignSpace Mission DesignSpacecraft Architecture DesignSpacecraft Configuration DesignSystem-level Design Space Exploration
Nomenclature α = function of Technology Readiness Level (TRL) β = complexity of each connection between pairs of components γ = 1/n Πi = expected profit for missions of type i A = Design Structural Matrix C = assembly, integration, and test cost C = development cost of each satlet variant C = non-recurring development costs C = aggregate system level PMSE estimate Ci R = recurring costs (manufacturing costs, operations costs, and launch costs) C1 = complexity due to number and flight readiness of components C2 = complexity due to pair-wise component interactions
2
An operations concept for Integrated Model-Centric Engineering at JPL
Todd Bayer, Lauren Cooney, Christopher Delp et al. · 2010 · 21 citations
Changing Satellite Morphology through Cellularization
David Barnhart, Lisa Hill, Margaret Turnbull et al. · 2012 · 20 citations