Journal of Green Building · 2006 · 11 citations · 7 references
EngineeringEnvironmental EngineeringEnvironmental SciencesLife Cycle AssessmentLifecycle EngineeringWaste ManagementDisposal PlanningMaterial Waste ManagementWaste DisposalWaste GenerationWaste ReductionDeconstructionDeconstruction PlanningHealth ImpactsInfrastructure DemolitionMaterial DeconstructionMechanical DemolitionReuseReuse Strategies
Abstract Nearly 2.5 million ft 2 of barracks must be removed from military facilities throughout the U.S. Environmental Protection Agency Region 4. While integration of manual deconstruction with traditional mechanical demolition methods has been shown to be comparable to traditional demolition methods in terms of cost and time requirements, the life cycle impacts of manual deconstruction on the environment and public health are unknown. To this end, life cycle assessment was applied to extend previous deconstruction studies of barracks at Ft. McClellan in Anniston, Alabama. Four scenarios were compared with varying degrees of time required for manual deconstruction of the barracks—100% Manual, 44% Manual, 26% Manual, and 100% Mechanical. Data were collected directly from the site and applied using SimaPro modeling software (Pré Associates, The Netherlands), considering two post-deconstruction options. Materials salvaged using either 100% or 44% Manual deconstruction and reused within a 20-mile radius of the deconstruction site yielded the most favorable environmental and health impacts. The significant impacts involved in the life cycle of diesel fuel required for transportation emphasize the need for developing reuse strategies for deconstructed materials at the regional level.
7
Handbook on Life Cycle Assessment: Operational Guide to the ISO Standards
JA de Bruijn, Guinée, Marieke Gorrée et al. · 2002 · 582 citations
The ECO-indicator 98 explained
Mark Goedkoop, Patrick Hofstetter, Ruedi Müller‐Wenk et al. · The International Journal of Life Cycle Assessment · 1998 · 121 citations · Full text