American Journal of Science · 1964 · 35 citations · 0 references
Natural ResourcesHydrologyGeotechnical EngineeringChannel DesignChannel MorphologyErosionChannel DeepeningChannel EntrenchmentChannel InundationTrenching
The channel trenching has been accelerated in two different periods, in 1875-95 and in 1935-45. Deepening has been of the order of 25 to 40 feet. The amount and rate are shown to have been influenced by increased rainfall.\--H.C.W.S