American Antiquity · 1996 · 54 citations · 7 references
HumanitiesArchaeologyIndustrial ArchaeologyPrehistoric ArchaeologySettlement ArchaeologyLithic AnalysisLithic TechnologyStone Tool TechnologyTechnological OrganizationCost-utility RatioLithic Technological OrganizationMass Ratio DeterminationTool TransportTransport Cost EffectsTransport Cost Minimization
Kuhn (1994) claimed that small lithic tools minimize kit weight while maximizing utility, a view that conflicts with prevailing ideas about mobility and the archaeological record. The authors identify a flaw in Kuhn’s utility/mass ratio equation and propose an alternative formula to correct it. Using the corrected formula and experimental data, they show that larger stone tools provide greater utility for less transport cost and offer additional benefits.
Kuhn (1994) argues that small lithic tools provide an optimal means of reducing the weight of mobile tool kits while maximizing potential utility. This assertion contradicts much of the current thinking about mobility and the organization of lithic technology and is at odds with the archaeological record. A flaw in Kuhn's equation for calculating the utility/mass ratio of retouched tools leads him to this erroneous conclusion. Problems with Kuhn's utility/mass ratio equation are described and an alternative formula is offered. The corrected formula indicates that larger stone tools maximize utility at a lower transport cost. Experimental evidence for additional advantages of larger stone tools is also provided.
7