Water Science & Technology · 1992 · 176 citations · 0 references
EngineeringEnvironmental EngineeringEnvironmental SciencesWastewater TreatmentWater Quality EngineeringWater TreatmentNitrogen CycleNitrogen ManagementNitrogen OxidesNitrogen RemovalNutrient RemovalDenitrificationDenitrification ProcessesNitrificationNitrite Removal
Nitrification processes often suffer transient nitrite build‑up, prompting interest in controlling this ion, especially in nitritation‑denitritation treatment schemes. The study aimed to identify the primary factors driving nitrite accumulation in biological nitrification. The investigation examined the influence of ammonium concentration, temperature, pH, and dissolved oxygen on nitrite build‑up. Results revealed that free ammonia and temperature are the key determinants of nitrite accumulation, offering guidance for designing improved fixed‑culture nitrogen removal processes.
Nitrification processes are well known for certain problems in connection with transient build-up of nitrite ions. Moreover, some works have shown interest in controlling the build-up of this ion, particularly when treatment procedures for nitrogenous pollution are of the nitritation-denitritation type. With this in mind, we have carried out a programme of research to check the main factors responsible for the accumulation of this ion, i.e. [NH4]o, T°, pH, and dissolved O2. The main results highlight the key role played by the free form N-NH3 and by the temperature. This research thus provides answers to a number of practical questions and allows us to envisage setting up new procedures for the treatment of nitrogenous pollution by fixed cultures.