Publication | Closed Access
An Analytic Approach to Scheduling Pipe Replacement
458
Citations
2
References
1979
Year
EngineeringScheduling Pipe ReplacementDeterioration ModelingOperations ResearchReliability EngineeringOptimal Replacement DateSystems EngineeringCombinatorial OptimizationMain BreaksStatisticsQuantitative ManagementPredictive AnalyticsDemand ForecastingForecastingScheduling ProblemCivil EngineeringPredictive MaintenanceProduction SchedulingBusinessScheduling (Production Processes)Failure RateProduction ForecastingFailure Prediction
A procedure is described that uses the history of main breaks to forecast how the number of breaks would change with time if the pipe were not replaced; a separate analysis predicts the failure rate of newly installed pipes. These forecasts are combined with cost data and a discount rate that accounts for inflation to determine the optimal replacement date.
| Year | Citations | |
|---|---|---|
Page 1
Page 1