Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study

H. Chen, Shiming Deng, H. Bruner, D. E. Claridge, W. D. Turner

OakTrust (Texas A&M University Libraries) · 2002 · 10 citations · 0 references

Full text

Open access

Concepts

Abstract

The Kleberg Building on the Texas A&M
\nUniversity campus is a teaching/research facility
\nconsisting of classrooms, offices and laboratories,
\nwith a total floor area of approximately 165,030 ft2.
\nContinuous Commissioning (CC) was performed
\non the building in August 1996 with additional
\nfollow-up in April 1999 and significant savings were
\nachieved. Subsequently, the building chilled water
\nand hot water energy consumption increased due to
\nlater building operational changes. This paper
\npresents the verification and follow-up efforts, which
\nidentified control problems in air handling units and
\nlaboratory variable air volume (VAV) systems and
\nprovided recommendations currently being
\nimplemented to restore HVAC optimization.